Budget 2025

Program Budget Organizations - Ministry of Construction & Infrastructure
in Rufiyaa
  2023
Actual
2024
Revised
2025
Budget
2026
Budget
2027
Budget
Ministry of Construction & Infrastructure
9,941,407,794 7,149,976,924 7,430,520,960 7,292,222,869 6,264,820,740
Executive and Corporate Services
81,895,803 74,516,485 129,838,570 336,106,495 315,715,589
Executive and Corporate Services
81,895,803 74,516,485 129,838,570 336,106,495 315,715,589
Administration
61,536,062 60,640,473 114,473,116 325,369,037 305,521,881
General admin
61,536,062 60,640,473 114,473,116 325,369,037 305,521,881
General admin
61,536,062 60,640,473 52,996,250 52,753,737 54,494,581
Devel. Of Mental Health Hospital- L. Gan
0 0 49,963,266 56,735,300 56,735,300
Construction of 100 bed hospital in Villimale
0 0 11,513,600 215,880,000 194,292,000
Human Resource
2,329,433 564,332 639,962 645,226 650,546
Human Resource
2,329,433 564,332 639,962 645,226 650,546
Human Resource
2,329,433 564,332 639,962 645,226 650,546
Information Communication Technology
8,604,423 13,273,095 14,725,492 10,092,232 9,543,162
Information Communication Technology
8,604,423 13,273,095 14,725,492 10,092,232 9,543,162
Information Communication Technology
8,604,423 13,273,095 14,725,492 10,092,232 9,543,162
Legal Affairs
9,425,885 38,585 0 0 0
Legal Affairs
9,425,885 38,585 0 0 0
Legal Affairs
9,425,885 38,585 0 0 0
Infrastructure
9,738,076,746 7,070,510,175 7,284,691,092 6,936,078,650 5,938,737,494
Support Services
20,218,876 12,094,477 15,198,716 15,201,961 15,205,368
Support Services
20,218,876 12,094,477 15,198,716 15,201,961 15,205,368
Support Services
20,218,876 12,094,477 15,198,716 15,201,961 15,205,368
Support Services
20,218,876 12,094,477 15,198,716 15,201,961 15,205,368
Engineering
0 0 0 0 0
Design
0 0 0 0 0
Design
0 0 0 0 0
Design
0 0 0 0 0
Project Implementation
9,717,857,870 7,058,415,698 7,269,492,376 6,920,876,689 5,923,532,126
Water & Sanitation
1,509,045,517 609,234,521 1,662,441,258 1,811,178,419 1,597,613,187
Water & Sanitation
1,509,045,517 609,234,521 1,662,441,258 1,811,178,419 1,597,613,187
Estab. Drainage System - HA.Dhihdhoo
0 0 0 0 0
Estab. Drainage System - Kulhudhuffushi
0 230,846 0 0 0
Estab. Drainage System - HDh.Vaikaradhoo
670,913 606,141 663,814 0 0
Estab. Drainage System - Dh.Kudahuvadhoo
0 36,029 0 0 0
Estab. Drainage System - Th.Veymandoo
0 79,264 0 0 0
Estab. Drainage System - Th.Thimarafushi
0 0 0 0 0
Estab. Water & Sewerage System - L.Mundoo
10,217,924 4,008,445 1,799,739 0 0
Estab. Water & Sewerage System - GA.Kondey
4,082,943 7,519,519 0 0 0
Estab. Water & Sewerage System - GDh.Rathafandhoo
11,005,538 1,155,659 0 0 0
Design and devel. of Flood mitigation faciility in R.Meedhoo
34,500 135,668 0 0 0
Devel. of Flood Mitigation System in Baa Atoll Thulhaadhoo
0 88,922 0 0 0
Development of Flood Mitigation System in Laamu Atoll Maavah
0 132,856 0 0 0
Estab. Of Water Drainage System - Dh.Maaenboodhoo
0 86,470 0 0 0
Estab. Water & Sewerage System - N.Maafaru
27,548,048 2,918,187 2,360,411 0 4,720,822
Storm Water Development and Maintenance (Male') Phase 4
9,464,361 562,482 0 0 0
Estab. Water System - Th.Madifushi
4,885,113 357,921 0 0 0
Estab. Water System - HDh.Naivaadhoo
0 187,352 878,898 0 0
Estab. Water System - Adh.Hanyaameedhoo
1,058,164 4,330,376 0 0 0
Repair & Maintenance of Water & Sewerage Projects
0 0 0 0 0
Estab. Sewerage System for New Settlement - Sh.Funadhoo
0 541,520 0 0 0
Estab. Sewerage System - ADh.Fenfushi
2,889,676 344,797 13,899,110 963,814 0
Sanitation in 5 islands
21,613,346 773,837 0 0 0
Estab. Sewerage System - K.Kaashidhoo
4,776,978 0 0 0 0
Estab. Sewerage System - R.Maakurathu
1,227,073 0 0 0 0
Estab. Sewerage System - L.Maavah
213,702 0 0 0 0
Estab. Sewerage System - F.Feeali
1,047,763 0 0 0 0
Estab. Sewerage System - HA.Baarah
0 1,629,253 313,156 794,088 0
Estab. Sewerage System - F.Bileidhoo
2,999,867 5,975,280 1,159,555 1,552,804 0
Estab. Sewerage System - GDh.Madaveli
510,900 88,980 0 0 0
Estab. Sewerage System - AA.Mathiveri
2,088,465 2,232,595 4,889,408 1,345,867 0
Estab. Sewerage System - GA.Gemanafushi
1,373,158 524,776 8,726,392 1,370,609 0
Estab. Sewerage System - R.Innamaadhoo
3,499,795 5,881,532 1,518,122 0 0
Estab. Sewerage System - GA.Maamendhoo
1,403,836 535,323 0 0 0
Prov.WaterSupply,Sani.&WasteMgmt-OFID-P2
2,745,345 1,140,971 105,223,647 69,201,353 53,924,458
Estab. Sewerage System - Sh.Foakaidhoo
526,831 68,385 0 0 0
Estab. Sewerage System - Lh.Kurendhoo
0 0 0 0 0
Estab. Sewerage System - HDh.Naivaadhoo
2,529,360 427,103 0 0 0
Estab. Sewerage System for New Settlement - GA.Villingili
6,583,089 400,278 0 0 0
Upg. Sewerage System - AA.Rasdhoo
0 0 0 0 0
Upg. Sewerage System - K.Guraidhoo
0 0 0 0 0
Upg. Sewerage System at New Settlement - L.Gan
0 487,632 0 0 0
Water and Sewerage System -HA.Maarandhoo
5,696,143 6,582,969 18,498,464 3,789,117 0
Water and Sewerage System - HDh.Kurinbi
1,801,540 3,992,980 1,159,555 987,867 0
Water and Sewerage System -HDh.Kumundhoo
28,075,166 9,244,970 19,046,598 41,166,219 0
Water and Sewerage System-Sh.Maungoodhoo
1,406,414 638,768 0 0 0
Water and Sewerage System - Sh.Goidhoo
23,321,701 7,537,600 13,820,472 0 0
Water and Sewerage System -Sh.Maroshi
4,142,375 2,269,669 1,148,782 1,860,477 0
Water and Sewerage System - N.Lhohi
771,972 362,939 0 0 0
Water and Sewerage System - N.Foddhoo
8,098,554 4,937,063 12,188,373 0 0
Water and Sewerage System - N.Kudafaree
1,120,769 0 0 0 0
Water and Sewerage System -N.Maalhendhoo
0 0 0 0 0
Water and Sewerage Systm-Kendhikulhudhoo
7,166,007 2,593,619 5,385,292 3,052,367 0
Water and Sewerage System -Angolhitheemu
954,382 450,347 3,948,513 978,852 0
Water and Sewerage System - R.Vaadhoo
1,372,412 410,215 2,200,679 2,966,079 963,704
Water and Sewerage System -R.Rasgetheemu
567,659 1,649,447 3,886,755 0 0
Water and Sewerage System -R.Inguraidhoo
0 3,051,106 0 0 0
Water and Sewerage System - R.Fainu
16,916,950 5,409,604 13,669,835 0 0
Water and Sewerage System - R.Kinolhas
0 0 0 0 0
Water and Sewerage System - B.Maalhos
8,507,370 1,397,421 19,246,441 0 0
Water and Sewerage System - B.Hithaadhoo
498,864 1,697,483 5,318,168 0 0
Water and Sewerage System - B.Kamadhoo
15,247,410 4,810,958 12,628,766 0 0
Water and Sewerage System -Olhuvelifushi
10,985,338 13,669,229 17,338,544 0 0
Water and Sewerage System - AA.Feridhoo
5,210,702 5,886,141 21,582,518 0 0
Water and Sewerage System - ADh.Dhihdhoo
2,512,636 295,910 0 0 0
Water and Sewerage System - Kunburudhoo
828,763 3,932,089 0 0 0
Water and Sewerage System - V.Keyodhoo
21,065,711 4,650,135 2,767,677 0 0
Water and Sewerage System-Th.Gaadhifushi
1,161,991 20,667 1,223,985 0 0
Water and Sewerage System -Th.Kinbidhoo
1,176,474 386,932 1,917,747 0 0
Water and Sewerage System - Th.Vandhoo
0 2,681,190 3,069,519 0 0
Water and Sewerage System -Th.Thakandhoo
0 565,806 1,183,562 963,010 0
Water and Sewerage System -L.Kunahandhoo
1,363,251 999,005 0 0 0
Water and Sewerage System - L.Hithadhoo
3,541,925 1,936,008 0 0 0
Water and Sewerage System -GA.Dhevvadhoo
3,795,839 4,404,064 0 0 0
Water and Sewerage System -Kanduhulhudoo
5,854,478 413,052 13,436,532 1,907,798 0
Water and Sewerage System - GA.Nilandhoo
4,019,769 1,581,464 0 0 0
Water and Sewerage Network - HA.Uligamu
2,015,745 364,268 1,202,399 1,909,410 0
Water and Sewerage Network -Hirimaradhoo
14,068,390 176,391 15,103,475 3,507,899 0
Water and Sewerage Network - Sh.Komandoo
1,794,359 255,377 5,656,686 1,176,759 0
Water and Sewerage Network - K.Gulhi
1,375,524 0 0 0 0
Water and Sewerage Network -AA.Himandhoo
5,000,756 5,668,684 2,828,343 0 0
Water and Sewerage Network -M.Naalafushi
1,766,622 758,526 19,481,837 17,710,761 3,542,152
Water and Sewerage Network -GDh.Nadellaa
3,092,076 1,621,046 0 0 0
Fuvamulak Water & Sewerage system
0 289,691 0 0 0
N. Landhoo Sewerage Sytem
0 0 0 0 0
Estab. Sewerage System - Adh.Omadhoo
545,268 0 0 0 0
Estab. Sewerage System - Adh.Hangnaameedhoo
0 0 0 0 0
Estab. Sewerage System - Sh.Feevah
1,495,599 6,857,436 2,700,789 1,089,980 0
B. Goidhoo Water & Sewerage System
5,165,070 0 0 0 0
Provision of Water Supply & Sewerage Project
782,833,647 182,159,510 140,179,562 386,295,394 167,053,392
Water & Sewerage System - F. Magoodhoo
1,964,709 0 0 0 0
Establishing Water & Sewerage System - HA.Vashafaru
21,469,307 142,715 17,524,665 0 0
Establishing Water & Sewerage System - M.Raiymandhoo
2,588,544 1,168,989 0 0 0
Establishing Water & Sewerage System - V.Rakeedhoo
6,505,975 20,294,911 3,192,940 1,499,033 0
Establishing Water & Sewerage System - HDh.Finey
0 0 0 0 0
Estab. Water & Sewerage System - N.Magoodhoo
0 1,744,942 0 0 0
Estab. Water & Sewerage System - HA.Filladhoo
74,492 359,654 1,869,940 0 0
Estab. Water & Sewerage System - HA.Molhadhoo
11,025,228 4,935,377 9,853,641 1,815,986 0
Estab. Water & Sewerage System - Sh.Noomara
517,759 1,543,378 0 0 0
Estab. Water & Sewerage System - Sh.Bileifahi
1,629,531 1,550,874 0 0 0
Estab. Water & Sewerage System - B.Kihaadhoo
863,631 5,773 0 0 0
Estab. Water & Sewerage System - B.Kudarikilu
928,994 40,397 0 0 0
Estab. Water & Sewerage System - B.Fulhadhoo
803,002 1,256,975 0 0 0
Estab. Water & Sewerage System - B.Fehendhoo
780,890 1,494,941 0 0 0
Estab. Water & Sewerage System - B.Dhonfanu
1,107,483 598,400 0 0 0
Estab. Water & Sewerage System - AA.Bodufulhadhoo
8,287,103 1,402,081 0 0 0
Estab. Water & Sewerage System - M.Veyvah
10,629,561 5,715,334 7,662,983 1,655,767 0
Estab. Water & Sewerage System - Dh.Rinbudhoo
15,338,799 4,104,000 7,662,983 0 0
Estab. Water & Sewerage System - Th.Omadhoo
8,057,008 2,994,145 0 0 0
Estab. Electricity, Water & Sewerage System - GDh.Thinadhoo
0 702,944 0 0 0
Outer Island Harbour, Water Supply & Sewerage - OFID Phase 3
131,087,641 130,180,272 248,656,200 112,550,000 96,898,082
Estab. Water & Sewerage System - HA.Thakandhoo
867,155 19,828,622 6,672,999 20,546,751 3,920,912
Estab. Water & Sewerage System - Sh.Narudhoo
531,225 635,006 0 0 0
Water and Sewerage System at New Settlement - S.Hithadhoo
12,736 501,672 0 0 0
Water and Sewerage System at Tourism Development Zone
0 86,470 0 0 0
Provision of Electricity, water and sewer to reclaimed land
0 86,470 0 0 0
Water Supply System - HA.Muraidhoo
6,788,995 3,998,559 12,045,101 0 0
Water Supply System - HDh.Nolhivaram
2,388,592 364,178 0 0 0
Water Supply System - Sh.Kanditheemu
2,877,180 1,876,532 1,159,555 985,728 0
Water Supply System - N.Holhudhoo
2,764,564 1,589,341 0 0 0
Water Supply System - R.AliFushi
1,090,930 1,215,475 2,274,644 915,885 0
Water Supply System- R.Innamaadhoo
4,035,078 8,824,910 14,524,330 0 0
Water Supply System - AA.Mathiveri
5,726,426 3,296,825 10,852,049 0 0
Water Supply System- ADh.Omadhoo
7,352,893 4,098,298 0 0 0
Water Supply System - Th.Dhiyamigili
4,833,294 586,638 0 0 0
Water Supply System - K.Hinmafushi
21,835,316 3,676,684 7,529,455 0 0
Water Supply System -Sh.Feevah
10,202,808 663,574 13,863,219 0 0
Water Supply System - N.Henbadhoo
6,026,620 3,511,781 8,925,776 0 0
Micro grid desalination Plant
797,374 51,555 38,833,686 2,043,876 0
Adh. Dhangethi Water Supply System
0 1,159,784 579,778 545,600 0
F. Nilandhoo Water Supply System
12,468,211 533,883 11,461,891 2,061,714 0
A.Dh Fenfushi Water Supply System
10,000 1,260,791 0 0 0
Estab. Water System - F.Feeali
3,601,439 1,341,038 9,651,215 1,287,262 0
Estab. Water System - HA.Utheemu
4,242,429 1,493,923 6,626,368 1,112,320 0
Estab. Water System - N.Miladhoo
1,290,404 612,801 0 0 0
Estab. Water System - N.Landhoo
0 1,555,711 0 0 0
Estab. Water System - R.Rasmaadhoo
4,076,022 2,225,052 8,005,498 1,263,636 0
Estab. Water System - R.Maakurath
7,734,991 5,344,501 8,489,893 1,591,492 0
Estab. Water System - K.Thulusdhoo
0 15,027 21,407,046 2,544,411 0
Upgrading Water System - Addu City
3,229,035 5,307 0 0 0
Estab. Water System - Dh.Hulhudheli
6,131,097 11,912 1,029,199 0 0
Estab. Water System - Dh.Maaenboodhoo
3,896,115 1,229,147 1,029,199 834,555 0
Estab. Water System - Th.Buruni
4,097,484 4,992,120 5,988,532 1,359,813 0
Estab. Water System - Th.Veymandoo
16,527,893 658,220 1,997,036 1,854,367 0
Estab. Water System - L.Maavah
0 1,533,630 0 0 0
Estab. Water System - L.Dhanbidhoo
8,617,245 9,360 1,159,555 1,334,134 0
Estab. Water & Sewerage System - R. Dhuvaafaru
0 2,085,687 0 0 0
Estab. Water & Sewerage System - DH. Kudahuvadhoo
0 2,077,201 0 0 0
Estab. Water & Sewerage System - LH. Hinnavaru
0 1,799,538 0 0 0
Estab. Water & Sewerage System - F. Nilandhoo
0 1,314,506 0 0 0
Estab. Water & Sewerage System - Sh. Kanditheem
0 724,033 0 0 0
Estab. Water & Sewerage System - Hdha. Neykurendhoo
0 794,327 0 0 0
Storm water drainage - Lh. Kurendhoo
0 351,472 0 0 0
Devel. of Access road - HDh.Kulhudhuhfushi
0 878,680 0 0 0
Construction of 1000 Housing Units- B.Eydhafushi
0 0 22,015,984 38,796,800 38,796,800
Development of Disaster Resilience in Male'
0 0 46,815,120 46,815,120 46,815,120
Greater Male' Roads and other facilties development
0 0 50,698,201 88,871,900 246,336,000
Devel. of parking buildings in K. Male'
0 0 22,383,799 33,891,000 33,891,000
Development of water and sewerage system in multiple islands
0 0 146,386,714 143,610,345 143,610,345
Construction of 100 bed Hospital in Vilimale
0 0 132,406,400 132,406,400 132,406,400
Upgrading of School Infrastructure
0 0 50,542,459 40,000,000 40,000,000
Devel. Of Roads in Male' and Villimale
0 0 61,692,000 431,844,000 431,844,000
Development of 4,200 Housing Units in k. Gulhifalhu
0 0 115,719,085 152,550,000 152,890,000
Harbor Project
1,391,256,566 1,050,492,004 2,054,141,290 1,983,078,356 1,859,094,375
Harbor Project
1,063,624,039 702,348,226 1,785,057,473 1,580,492,887 1,526,086,251
Upgrading of Harbour - R. Rasgetheemu
1,340,360 1,787,147 0 0 0
Habour Construction - HA.Molhadhoo
27,228 429,335 1,517,643 0 0
Upgrading of Habour - HDh.Nellaidhoo
0 686,332 1,347,600 0 0
Development of slipway - HDh.Makunodhoo
0 99,441 0 0 0
Reconstruction of Habour - Sh.Feevah
197,626 998,751 2,498,546 0 0
Upgr.Habour&Shore Protection-Sh.Lhaimagu
7,538,376 9,134,652 3,690,335 3,212,660 0
Upgrading Harbour - Sh.Noomara
9,189,695 11,684,577 0 0 0
Upgrading of Habour - Sh.Bileffahi
8,367,208 455,511 4,171,200 2,161,612 0
Upgrading of Habour - Sh.Feydhoo
7,772,471 3,933,421 3,388,039 0 0
Upgrading of Habour - Sh.Komandoo
0 0 0 0 0
Upgrading of Habour - N.Miladhoo
26,992 607,929 3,631,625 0 0
Upgrading of Habour- N.Landhoo
2,800 513,113 890,099 0 0
Habour Construction - R.Maduvvari
12,017,513 989,583 5,568,874 0 0
Upgrading of Habour - R.Rasmadhoo
27,142 17,040 1,284,704 0 0
Upgrading of Habour - B.Goidhoo
105,629 0 0 0 0
Habour Construction - ADh.Mandhoo
6,075,730 447,963 5,817,775 1,860,611 0
Construction of T-Jetty - V.Rakeedhoo
0 0 0 0 0
Developing Harbour - Dh.Rinbudhoo
29,580 0 0 0 0
Upgrading of Habour - Dh.Hulhudheli
33,137 574,016 1,281,810 0 0
Upgrading of Habour - Dh.Meedhoo
20,529,360 3,407,449 2,093,144 0 0
Reconstruction of Habour - Th.Guraidhoo
11,112 663,165 1,148,408 0 0
Habour Construction - Th.Omadhoo
0 0 0 0 0
Upgrading of Habour - L.Isdhoo
20,856 746,733 1,038,357 0 0
Breakwater project - GA.Maamendhoo
0 448,798 1,584,938 0 0
Development Of Slipway - Gdh.Hoadedhoo
0 89,352 0 0 0
Upgrading of Habour - Fuvahmulah City
6,393 1,286,237 0 0 0
Upgr. Habour and Revetment - S.Meedhoo
2,500 510,694 912,906 0 0
Developing Harbour - S.Maradhoofeydhoo
0 0 0 0 0
Upgrading of Harbour - R.Angolhitheemu
4,421,484 554,572 1,266,943 0 0
Sh. Foakaidhoo Harbor Upgrading
29,260 630,951 1,649,519 0 0
Developing Harbour (Phase 3) - GA. Villingili
45,624,851 24,730,010 27,426,755 5,716,987 0
Harbor Upgrading - HA. Ihavandhoo
3,176,914 569,720 1,553,256 0 0
Jetty Construction - HA. Dhidhdhoo
0 93,676 0 0 0
Harbor Project (Phase II)- HA. Kelaa
0 0 0 0 0
Harbor Upgrading - HDh. Hanimaadhoo
2,333,457 995,270 1,728,307 0 0
Repairing Harbour - HDh. Naivaadhoo
9,011,630 1,432,864 0 0 0
Harbor Project (Phase II)- K. Himmafushi
840,807 439,336 762,117 0 0
Harbor Upgrading - K. Huraa
10,176,814 1,076,526 0 0 0
Harbor Upgrading - ADh. Hangnaameedhoo
2,173,275 465,217 1,698,135 0 0
Harbor Construction - ADh. Dhidhdhoo
0 0 0 0 0
Harbor Upgrading - F.Dharanboodhoo
398,841 2,742,490 1,010,341 0 0
Regional Harbor Dev. Study -Kudahuvadhoo
0 0 0 0 0
Ice Plant Jetty Construction - GDh. Thinadhoo
94,658 0 0 0 0
Expansion of Harbour entrance channel - S. Hulhumeedhoo
14,949,566 11,822,125 6,375,815 3,887,575 0
Developing Harbour - HA.Baarah
1,343,945 10,874,266 0 0 0
Expansion of Harbour - HA.Uligamu
0 0 0 0 0
Expan. of Harbour & Const. of Entrance Channel - HA.Uligamu
0 0 0 0 0
Developing Harbour - HA.Muraidhoo
13,055,779 3,317,840 2,041,209 2,044,297 0
Developing Harbour - HA.Dhihdhoo
27,498,455 1,637,007 2,041,209 4,700,931 0
Upgrading Entrance Channel - HA.Thakandhoo
8,789,004 322,760 0 0 0
Developing Entrance Channel - HDh.Kumundhoo
19,151,686 6,360,176 907,227 0 0
Upgrading Harbour - Sh.Maroshi
17,597,012 11,164,610 2,811,916 0 0
Developing Central Ferry Terminal - Sh.Funadhoo
0 0 0 0 0
Upgrading Harbour - N.Lhohi
10,620,620 16,366,078 0 0 0
Developing Entrance Channel - N.Manadhoo
13,469,612 8,526,205 3,274,812 1,964,739 0
Upgrading Entrance Channel - R.Ungoofaaru
507,191 267,888 0 0 0
Extension of Harbour - R.Maakurath
7,813,672 384,467 0 0 0
Developing Breakwater & Quay Wall - B.Hithaadhoo
6,018,121 618,354 0 0 0
Reconstruction of Harbour - B.Kamadhoo
25,269,606 13,290,691 4,227,327 2,768,396 0
Developing Harbour - B.Eydhafushi
10,528,908 7,410,008 0 0 0
Upgrading Harbour - Lh.Hinnavaru
65,957,996 16,622,533 3,595,065 1,313,637 0
Developing Quay Wall - K.Kaashidhoo
0 87,911 0 0 0
Devel. Breakwater at Ferry Terminal - AA.Ukulhas
1,932,412 4,834,613 1,879,760 0 0
Reconstruction of Harbour - AA.Thoddoo
16,759,356 575,184 8,032,624 0 0
Upgrading Harbour - Adh.Fenfushi
13,689,629 12,960 5,381,823 0 0
Upgrading Harbour - V.Thinadhoo
6,573,412 1,446,526 0 0 0
Reconstruction of Harbour - M.Muli
59,508,502 8,245,112 67,164 0 0
Upgrading Harbour - M.Dhiggaru
0 93,676 0 0 0
Reconstruction of Harbour - Th.Kandoodhoo
14,774,244 6,383,116 2,691,665 0 0
Extension of Harbour - GA.Dhaandhoo
25,272,942 3,523,319 34,127,212 7,086,251 7,086,251
Estab. Regional Harbour - GDh.Thinadhoo
0 0 0 0 0
Repairing Harbour - GDh.Gadhdhoo
21,107,254 644,428 559,011 2,235,075 0
Developing Breakwater of Old Harbour - S.Hithadhoo
36,704,571 32,945,060 559,011 7,034,511 0
Developing Harbour - S.Hulhudhoo
6,709,363 781,176 8,475,328 0 0
Developing Slipway - N.Kendhikulhudhoo
11,853,409 6,589,463 0 0 0
Port Development Project - K.Gulhifalhu
935,572 250,016,631 0 0 0
Upgrading Harbour - L.Gan
7,426,736 875,671 4,537,756 1,736,125 0
Developing Breakwater - M.Maduvvari
0 0 0 0 0
Development Of Slipway - N.Velidhoo
11,950,311 5,116,402 25,659,608 2,502,138 0
Developing Harbour - Sh.Maaungoodhoo
18,882,000 15,625,923 8,390,082 0 0
Devel. Of Breakwater and Harbour - R.Dhuvaafaru
1,715,718 1,257,592 0 0 0
Repairing Harbour - Sh.Narudhoo
11,354,052 1,467,571 0 0 0
Upgrading Harbour - Th.Buruni
8,804,015 12,480 0 0 0
Development Of Slipway - V.Rakeedhoo
0 0 0 0 0
Upgrading Harbour - L.Maamendhoo
0 85,029 0 0 0
Jetty Construction - HDh.Kulhudhuffushi
256,608 0 0 0 0
Devel. Of Ferry Terminal - Lh.Naifaru
0 0 0 0 0
Developing Of Breakwater - LH.Kurendhoo
8,014,805 1,252,304 0 0 0
Habour Survey and Designing - GDh.Fiyoaree
0 969,239 0 0 0
Developing Harbour - L.Kalaidhoo
0 93,676 0 0 0
High Speed Ferry Network Access Improvement Platform
0 461,174 0 0 0
Repairing Harbour - B.Maalhos
7,852,557 6,148,892 0 0 0
Extension of Harbour - GA.Gemanafushi
0 14,033,637 0 0 0
Upgrading Entrance Channel - B.Thulhaadhoo
3,420,109 507,746 0 0 0
Upgrading Harbour- N.Kendhikulhudhoo
0 0 0 0 0
Upgrading Harbour & Lighting - AA.Mathiveri
0 85,029 0 0 0
Upgrading Old Harbour - AA.Ukulhas
4,021,594 617,838 0 0 0
Upgrading Harbour - Adh.Dhigurah
14,834,799 8,965,926 0 0 0
Upgrading Harbour - Adh.Omadhoo
20,836,200 5,534,243 0 0 0
Upgrading Harbour - B.Dharavandhoo
10,458,166 13,744,644 0 0 0
Upgrading Harbour - K.Maafushi
30,185,395 2,661,154 60,717,433 8,259,966 0
Upgrading Harbour - M.Naalaafushi
0 93,676 0 0 0
Upgrading Harbour - S.Feydhoo
11,981,216 1,443,821 0 0 0
Upgrading Harbour - TH.Thimarafushi
0 98,000 0 0 0
Upgrading of Jetty - R.Angolhitheem
0 83,011 0 0 0
Upgrading Harbour - H.Dh.Finey
7,224,056 1,422,081 0 0 0
Const. of Entrance Channel - N.Kudafari
0 1,187,436 0 0 0
Developing Entrance Channel - R.Inguraidhoo
2,626,818 247,705 0 0 0
Upgrding Harbour - H.DH.Neykurendhoo
2,661,196 1,435,805 0 0 0
Upgrding Harbour - Aa.Feridhoo
7,620,855 11,608,460 0 0 0
Upgrading Harbour and leveling mudlands - Sh.Milandhoo
27,101,367 5,503,139 0 0 0
Exten. of harbor & Ease of Acc. to Quay Wall - ADH.Dhangethi
11,528,536 1,244,098 0 0 0
Repairing Harbour - K.Gaafaru
0 76,382 0 0 0
Upgrding Harbour - Dh.Kudahuvadhoo
13,499,998 720,786 0 0 0
Reconstruction of Harbour-GD.Kaadedhhoo
9,500 137,301 238,176 0 0
Expan. of Harbour & Const. of Entrance Channel - HA.Uligamu
54,012,041 633,233 2,969,179 0 0
Upgrading Entrance Channel - Lh. Naifaru
0 77,823 0 0 0
Developing Harbour and Coastal protection - M.Raimandhoo
10,339,632 1,115,798 0 0 0
Developing Harbour - V.Fulidhoo
0 12,693,365 0 0 0
Jetty Extension - Hdh.Kulhudhufushi
1,960,903 6,088,320 0 0 0
Upgrading Entrance Channel - HA.Utheemu
19,032 1,429,609 0 0 0
Exten. harbour with picnic island devel. - Lh. Olhuvelifushi
9,960,438 1,074,878 0 0 0
Devel. Harbour - N.Holhudhoo (Holhu-Meedhoo)
0 84,597 0 0 0
Extension of Harbor - N. Kendhikulhudhoo
0 1,314,586 0 0 0
Harbour Updage of R. innamaadhoo
10,887,752 1,152,353 0 0 0
Devel. harbour and estab. Of pavements at Jetty-GA.Nilandhoo
0 75,661 0 0 0
Upgrading of Harbour - GA.Dhevvadhoo
0 445,148 0 0 0
Upgrading of Izzuddin Jetty
0 404,877 0 0 0
Upgrading of Harbour - Sh. Goidhoo
0 95,117 0 0 0
Upgrading of Harbour - K.Kaashidhoo
0 527,208 0 0 0
Upgrading of Harbour - Th.Vandhoo
0 89,785 0 0 0
Upgrading of Harbour - Sh. Goidhoo
0 99,441 0 0 0
Upgrading Harbour - Th. Kinbidhoo
0 93,676 0 0 0
Land Reclamation and development of harbour
16,828,332 1,170,651 0 0 0
Fixing Channel breakwater - N.Maafaru
0 77,823 0 0 0
Developing Harbour- R.Meedhoo
7,259,918 979,315 0 0 0
Developing Harbour - L.Mundoo
0 85,029 0 0 0
Developing Harbour - GDh.Faresmaathoda
53,636 386,060 0 0 0
Developing Harbor - N.Magoodhoo
13,713,161 4,191,684 5,720,122 2,007,376 0
Developing Harbour - HDh.Kurinbi
2,701,397 2,516,778 0 0 0
Developing Harbour - L.Dhanbidhoo
0 1,219,369 0 0 0
Upgrading Harbour - R.Kinolhas
21,433,719 541,870 1,834,384 0 0
Upgrading Harbour - AA.Maalhos
35,414,085 8,515,066 1,670,243 0 0
Completion of Breakwater - AA.Rasdhoo
0 1,294,188 0 0 0
Reconstruction of Harbours - IDB
0 0 0 0 0
Developing Entrance Channel - K.Kaashidhoo
4,406,223 0 0 0 0
Reconstruction of Harbour - M.Veyvah
0 0 0 0 0
Ease of Access to Harbour - N.Fohdhoo
8,114,199 93,676 0 0 0
Establishment of Jetty and shore protection-M.Raiymandhoo
0 0 0 0 0
Developing Harbour - B.Fulhadhoo
13,824 530,601 1,817,248 0 0
Developing Harbour - B.Fehendhoo
49,985 3,066,782 4,493,688 0 0
Harbour Expansion Project - Kulhudhuffushi
228,738 0 0 0 0
Developing Jetty - V.Fulidhoo
423,247 0 0 0 0
Repair & Maintenance of Harbors
0 0 0 0 0
Estab. Of High Speed Ferry System - North Region
237,522 0 0 0 0
Ease of access to Habour - V.Fulidhoo
0 87,911 0 0 0
Intergrated National Public Ferry Network (Phase 2 & 3)
2,264,673 0 0 0 0
Upgr. Of Ice Plant Jetty - F.Feeali
0 93,676 0 0 0
Jetty Construction - HDh.Kulhudhuffushi
0 633,624 0 0 0